After purchasing a plastic tube filling and sealing machine, you need to pay attention to the following points to ensure the normal operation and maintenance of the Plastic Tube Filling Machine.
1. Installation and debugging: According to the installation guide provided by the plastic tube filling and sealing machine supplier, install the machine correctly and perform necessary debugging to ensure that the Plastic Tube Filling Machine is running well before starting production.
2. Operation training: Ensure that the operation team has received sufficient training on how to properly operate and maintain the plastic tube filling and sealing machine, which helps reduce operating errors and maintenance issues.
3. Maintenance plan: Develop a regular maintenance plan for the plastic tube filling sealing machine, including cleaning, lubrication and replacement of worn parts, and follow the maintenance recommendations provided by the supplier
4. Parts supply: Establish a spare parts inventory in case of emergency, which can reduce production interruptions due to parts failure
5. Safety inspection: Regularly conduct safety inspections of the plastic tube filling sealing machine to ensure that all safety devices and emergency stop devices are working properly.。
Model no |
Nf-40 |
NF-60 |
NF-80 |
NF-120 |
Tube material |
Plastic aluminum tubes .composite ABL laminate tubes |
|||
Station no |
9 |
9 |
12 |
36 |
Tube diameter |
φ13-φ60 mm |
|||
Tube length(mm) |
50-220 adjustable |
|||
viscous products |
Viscosity less than 100000cpcream gel ointment toothpaste paste food sauce and pharmaceutical, daily chemical, fine chemical |
|||
capacity(mm) |
5-250ml adjustable |
|||
Filling volume(optional) |
A:6-60ml, B:10-120ml, C:25-250ml, D:50-500ml (Customer made available) |
|||
Filling accuracy |
≤±1% |
|||
tubes per minute |
20-25 |
30 |
40-75 |
80-100 |
Hopper Volume: |
30litre |
40litre |
45litre |
50 litre |
air supply |
0.55-0.65Mpa 30 m3/min |
340 m3/min |
||
motor power |
2Kw(380V/220V 50Hz) |
3kw |
5kw |
|
heating power |
3Kw |
6kw |
||
size(mm) |
1200×800×1200mm |
2620×1020×1980 |
2720×1020×1980 |
3020×110×1980 |
weight (kg) |
600 |
800 |
1300 |
1800 |
Model no |
Nf-40 |
NF-60 |
NF-80 |
NF-120 |
Tube material |
Plastic aluminum tubes .composite ABL laminate tubes |
|||
Station no |
9 |
9 |
12 |
36 |
Tube diameter |
φ13-φ60 mm |
|||
Tube length(mm) |
50-220 adjustable |
|||
viscous products |
Viscosity less than 100000cpcream gel ointment toothpaste paste food sauce and pharmaceutical, daily chemical, fine chemical |
|||
capacity(mm) |
5-250ml adjustable |
|||
Filling volume(optional) |
A:6-60ml, B:10-120ml, C:25-250ml, D:50-500ml (Customer made available) |
|||
Filling accuracy |
≤±1% |
|||
tubes per minute |
20-25 |
30 |
40-75 |
80-100 |
Hopper Volume: |
30litre |
40litre |
45litre |
50 litre |
air supply |
0.55-0.65Mpa 30 m3/min |
340 m3/min |
||
motor power |
2Kw(380V/220V 50Hz) |
3kw |
5kw |
|
heating power |
3Kw |
6kw |
||
size(mm) |
1200×800×1200mm |
2620×1020×1980 |
2720×1020×1980 |
3020×110×1980 |
weight (kg) |
600 |
800 |
1300 |
1800 |
Model no |
Nf-40 |
NF-60 |
NF-80 |
NF-120 |
Tube material |
Plastic aluminum tubes .composite ABL laminate tubes |
|||
Station no |
9 |
9 |
12 |
36 |
Tube diameter |
φ13-φ60 mm |
|||
Tube length(mm) |
50-220 adjustable |
|||
viscous products |
Viscosity less than 100000cpcream gel ointment toothpaste paste food sauce and pharmaceutical, daily chemical, fine chemical |
|||
capacity(mm) |
5-250ml adjustable |
|||
Filling volume(optional) |
A:6-60ml, B:10-120ml, C:25-250ml, D:50-500ml (Customer made available) |
|||
Filling accuracy |
≤±1% |
|||
tubes per minute |
20-25 |
30 |
40-75 |
80-100 |
Hopper Volume: |
30litre |
40litre |
45litre |
50 litre |
air supply |
0.55-0.65Mpa 30 m3/min |
340 m3/min |
||
motor power |
2Kw(380V/220V 50Hz) |
3kw |
5kw |
|
heating power |
3Kw |
6kw |
||
size(mm) |
1200×800×1200mm |
2620×1020×1980 |
2720×1020×1980 |
3020×110×1980 |
weight (kg) |
600 |
800 |
1300 |
1800 |
6. Production monitoring: Monitor the performance of the plastic tube filling sealing machine to ensure that it reaches the expected production capacity and filling accuracy in production.
7. Cleanliness and hygiene: Keep equipment clean and hygienic, especially when handling sensitive products such as food or pharmaceuticals, to ensure that the products meet hygiene standards.
8. Troubleshooting: Train operations teams so they can quickly identify and resolve possible failures.
9. Compliance: Ensure that the plastic tube filling sealing machine complies with all applicable regulations and standards during operation, especially those related to product packaging and hygiene.
10. After-sales support: Keep in touch with suppliers of plastic tube filling and sealing machine . If repairs and upgrades are needed or you have any questions, get after-sales support in time. Regular maintenance and upkeep will help extend the service life of the composite pipe filling and sealing machine and ensure high quality. production and reduce the risk of unexpected failures.
Post time: Feb-28-2024